Free Estimates(303) 915-8649
Interior

Kitchen Cabinets

Custom and semi-custom cabinet installs — measured, planned, and hung level with even reveals and soft-close hardware throughout. Cabinet doors that align right, drawers that close without slamming, and a layout that actually works the way you cook.

We work with shop-built custom, KraftMaid / Diamond / Medallion semi-custom, and stock IKEA / Lowe's lines depending on budget and timeline.

Kitchen Cabinets — Best Value Landscaping & Fencing
5.0
Star Rated Work
Licensed
& Fully Insured
100%
Satisfaction
Free
Written Estimates

Layout and design — done before ordering

We measure, draw a CAD layout, and walk through it with you before placing the cabinet order. Appliance widths, filler placement, drawer-vs-door decisions, and the lazy-Susan-or-pull-out call all happen on paper, not on install day.

Get a free cabinet estimate
Layout and design — done before ordering — Kitchen Cabinets

Install — level, plumb, and reveal-tight

Hung to a laser line — not to walls that lean half an inch over six feet of run. Shimmed and screwed into studs (never drywall anchors), with even reveals between doors. Toe kicks scribed to the floor for a clean line.

Get a free cabinet estimate
Install — level, plumb, and reveal-tight — Kitchen Cabinets

Counter coordination

We template counters AFTER cabinets are hung, never from drawings. Quartz, granite, or solid-surface — coordinated with our suppliers so the timeline doesn't slip waiting on a slab.

Get a free cabinet estimate
Counter coordination — Kitchen Cabinets
Spec Sheet

Cabinetry options

From budget stock to fully custom, with hardware specified by name.

Custom
Shop-built inset face-frame, white oak / walnut / paint-grade poplar
Semi-custom
KraftMaid, Diamond, Medallion — 4–6 week lead time
Stock
IKEA SEKTION, Lowe's Diamond NOW — 1–2 week lead
Drawer slides
Blum Tandem under-mount, full-extension, soft-close
Hinges
Blum or Salice 6-way adjustable, soft-close
Hardware
Top Knobs, Rejuvenation, or owner-supplied
How It Runs

How a kitchen cabinets project actually runs

01

Owner walk & written scope

The owner walks the property, measures, and asks what isn't working. You get a written scope with material specs by name — no allowance line items.

02

Design & selections

Layouts, material samples, and finish options reviewed in your space. Included in the project, not billed separately.

03

Permits & site prep

We pull the permit when one is required, protect existing surfaces, and prep the site. Surprises documented in writing before any change order.

04

Build with one crew

Same crew start to finish. Daily clean-up, dust control where needed, and a foreman you can text directly.

05

Walk-through & punch list

Written punch list signed by you. We don't take final payment until you sign off the walkthrough.

Ready to start your project?

Get a free cabinet estimate
Pricing Transparency

What moves the price on cabinets

Cabinet tier is the headline — but layout complexity matters too.

  • $
    Cabinet tier

    Stock vs. semi-custom vs. fully custom roughly spans a 4x range.

  • $
    Layout complexity

    Galley kitchens install fast. L-shaped with island and full pantry wall takes meaningful extra time.

  • $
    Modifications

    Custom widths, toe-kick drawers, appliance garages, and inset doors all add cost.

  • $
    Counter material

    Laminate vs. quartz vs. quartzite vs. natural stone spans a wide range.

We can handle just the install if you're sourcing cabinets yourself, or full design-build with our suppliers.

See The Work

Recent kitchen cabinets projects

Real homes, real scope, real craftsmanship — a snapshot of work delivered across the Denver metro.

cabinets project photo 1cabinets project photo 2cabinets project photo 3cabinets project photo 4cabinets project photo 5cabinets project photo 6
Where We Work

Kitchen Cabinets across the Denver metro

FAQ

Frequently Asked Questions

Do you also do counters?+

We coordinate counter templating and install with our quartz and granite suppliers right after the cabinets land.

How long does install take?+

Most kitchens install in 2–4 days. Add 1–2 weeks for counter template, fab, and install on top.

Can I bring my own cabinets?+

Yes. We do a lot of IKEA installs — we'll measure, plan layout, assemble, and hang to laser line.

Stock vs. semi-custom — which makes sense?+

Stock works if your kitchen fits standard widths. The minute you need custom widths, fillers, or inset doors, semi-custom pays back fast.

We Also Serve

Get a free cabinet estimate

One foreman, one written price, one schedule. Free on-site estimate from the owner.